TENGIZCHEVROIL – Future Growth Project/ WPMP

SUMMARY

The integrated Future Growth Project-Wellhead Pressure Management Project (FGP-WPMP) is designed to further increase total daily production from the Tengiz reservoir and maximize the ultimate recovery of resources.

The FGP will use state-of-the-art sour gas injection technology, successfully developed and proven during TCO’s previous expansion in 2008, to increase daily crude oil production from Tengiz by approximately 260,000 barrels per day.

In parallel, the WPMP maximizes the value of existing TCO facilities by extending the production plateau and keeping existing plants producing at full capacity. First oil is planned for 2022.

PROJECT INFO

Years: 2016-2018
Client: Tengizchevroil (TCO)
Vendor: Isoplus Mediterranean - Villamarzana (RO)
Contractor: Tenaris
Object: Dual FBE Coating of single and double joints

Monitoring during coating application and online and offline tests